We are committed to leading the way in utilities and energy transition contracting; our mission is to innovate and deliver sustainability. OCU’s passion for addressing complex challenges brings new standards of growth in our people and capabilities.

Capital Major / Minor Mechanical and Electrical Frameworks

Delivering clean and wastewater projects as a Capital Alliance Delivery Partner for Welsh Water under AMPs 8 & 9, building on over 15 years of partnership and framework support across pipelines, mechanical and electrical works.

Capital Delivery Pressurised Pipeline Framework Welsh Water

Longstanding delivery partner on Welsh Water’s Pressurised Pipe Framework since 2012, delivering mains rehabilitation, planned and emergency trunk main works, HDD river and rail crossings, and 24/7 support for complex reactive repairs.

Mill Hill, Longforgen

Upgraded the electrical infrastructure at Mill Hill, Longforgan with new 11kV wood poles, overhead switchgear, and a third conductor to supply a 200kVA transformer, enabling a three-phase connection for new solar and ground source heat pump installations.

Mill Drowndubbs

Upgraded the electrical infrastructure at Mill Drowndubbs with new 11kV wood poles, overhead switchgear, and an additional conductor to provide a three-phase supply and transformer upgrade for an SSEN customer.

Peterhead Substation

Under an NEC3 subcontract, we built a 2000m² GIS Substation, two transformer buildings, a 210m x 150m platform, reinforced structures, improved access, and installed underground cabling with GRP covers.

Neilston Grid Stability Facility

NEC4 Option A contract involved the construction of a 653m² portal frame for a Synchronous Condenser, with 8500m² platform, 1km access road, fencing and earthing - providing robust, secure foundations for long-term operation.

Pitkevey BESS Fife, Scotland

The project covered full BoP works for a 50MW battery storage site in Fife, including access roads, drainage, switchrooms, 33kV cabling, MV transformers, BESS units, and 2km of DNO cabling over sensitive terrain.

Cork Harbour Horizontal Directional Drilling

OCU was contracted to design and install twin 1,025 metre lengths of 500mm Diameter SDR-9 PE100 Foul Main under Cork Harbour using Horizontal Directional Drilling (HDD).

Dee-crossing Connah's Key

OCU was awarded the Dee Crossing contract, located in Connah’s Quay. Our teams designed and installed two 860m-long barrier pipelines under the River Dee using Horizontal Directional Drilling (HDD). 

Ray Wind Farm 20MW BESS Project

This 20MW Battery Energy Storage System (BESS) project was constructed at Ray Wind Farm approximately 5km south of the village of Otterburn in Northumberland.

Pitkevy 40 MW BESS Project

Our teams delivered the Civil and Electrical works associated with a new 50MW Battery Energy Storage System (BESS).

Jamesfield 49MW BESS Project

Our teams provided the Civil and Electrical works associated with a new 49MW Battery Energy Storage System (BESS).