top of page
6W2A1946 - Large.jpg

Case Studies

We are committed to leading the way in utilities and energy transformation contracting; our mission is to innovate and deliver sustainability. OCU’s passion for addressing complex challenges brings new standards of growth in our people and capabilities.

Filter Case Studies By:

Braidwood Primary Substation - SP Energy Networks (SPEN)

Delivering a full refurbishment of the 12 MVA primary transformer T2 at Braidwood Primary Substation, Scotland, restoring safe and reliable operation while ensuring full compliance with environmental and operational standards.

Water Retaining Structures
(WRS) Framework Affinity Water

Delivering new service reservoirs under the WRS Framework for Affinity Water’s Strategic Supply 2040 Programme, increasing storage capacity and strengthening water supply resilience across Bedfordshire and Hertfordshire.

Network Maintenance Services
United Utilities

Providing specialist network maintenance under Lot 8 of United Utilities’ framework, delivering complex repairs to noncore clean water assets including aqueducts and pipe bridges, with key works such as the multi-year refurbishment of the historic Lake Vyrnwy Aqueduct.

HS2, Old Oak Common
Enabling and Multi Utility Diversion Works

Delivering multiple utility diversion packages at Old Oak Common Station, including water, gas, regulated power and telecoms, enabling construction of the HS2 transport superhub in West London.

HS2 Infrastructure
Enabling and Multi Utility Diversion Works

Delivering utility diversions across water, gas, power and telecoms for a major UK rail project, with our Water and HDD teams applying NIRS, GIRS and WIRS accreditations to complete complex works in constrained environments.

Capital Major / Minor Mechanical and Electrical Frameworks

Delivering clean and wastewater projects as a Capital Alliance Delivery Partner for Welsh Water under AMPs 8 & 9, building on over 15 years of partnership and framework support across pipelines, mechanical and electrical works.

Capital Delivery Pressurised Pipeline Framework Welsh Water

Longstanding delivery partner on Welsh Water’s Pressurised Pipe Framework since 2012, delivering mains rehabilitation, planned and emergency trunk main works, HDD river and rail crossings, and 24/7 support for complex reactive repairs.

Mill Hill, Longforgen

Upgraded the electrical infrastructure at Mill Hill, Longforgan with new 11kV wood poles, overhead switchgear, and a third conductor to supply a 200kVA transformer, enabling a three-phase connection for new solar and ground source heat pump installations.

Mill Drowndubbs

Upgraded the electrical infrastructure at Mill Drowndubbs with new 11kV wood poles, overhead switchgear, and an additional conductor to provide a three-phase supply and transformer upgrade for an SSEN customer.

Peterhead Substation

Under an NEC3 subcontract, we built a 2000m² GIS Substation, two transformer buildings, a 210m x 150m platform, reinforced structures, improved access, and installed underground cabling with GRP covers.

Neilston Grid Stability Facility

NEC4 Option A contract involved the construction of a 653m² portal frame for a Synchronous Condenser, with 8500m² platform, 1km access road, fencing and earthing - providing robust, secure foundations for long-term operation.

Pitkevey BESS Fife, Scotland

The project covered full BoP works for a 50MW battery storage site in Fife, including access roads, drainage, switchrooms, 33kV cabling, MV transformers, BESS units, and 2km of DNO cabling over sensitive terrain.

Braidwood Primary Substation - SP Energy Networks (SPEN)

Delivering a full refurbishment of the 12 MVA primary transformer T2 at Braidwood Primary Substation, Scotland, restoring safe and reliable operation while ensuring full compliance with environmental and operational standards.

Water Retaining Structures
(WRS) Framework Affinity Water

Delivering new service reservoirs under the WRS Framework for Affinity Water’s Strategic Supply 2040 Programme, increasing storage capacity and strengthening water supply resilience across Bedfordshire and Hertfordshire.

Network Maintenance Services
United Utilities

Providing specialist network maintenance under Lot 8 of United Utilities’ framework, delivering complex repairs to noncore clean water assets including aqueducts and pipe bridges, with key works such as the multi-year refurbishment of the historic Lake Vyrnwy Aqueduct.

HS2, Old Oak Common
Enabling and Multi Utility Diversion Works

Delivering multiple utility diversion packages at Old Oak Common Station, including water, gas, regulated power and telecoms, enabling construction of the HS2 transport superhub in West London.

HS2 Infrastructure
Enabling and Multi Utility Diversion Works

Delivering utility diversions across water, gas, power and telecoms for a major UK rail project, with our Water and HDD teams applying NIRS, GIRS and WIRS accreditations to complete complex works in constrained environments.

Capital Major / Minor Mechanical and Electrical Frameworks

Delivering clean and wastewater projects as a Capital Alliance Delivery Partner for Welsh Water under AMPs 8 & 9, building on over 15 years of partnership and framework support across pipelines, mechanical and electrical works.

Capital Delivery Pressurised Pipeline Framework Welsh Water

Longstanding delivery partner on Welsh Water’s Pressurised Pipe Framework since 2012, delivering mains rehabilitation, planned and emergency trunk main works, HDD river and rail crossings, and 24/7 support for complex reactive repairs.

Mill Hill, Longforgen

Upgraded the electrical infrastructure at Mill Hill, Longforgan with new 11kV wood poles, overhead switchgear, and a third conductor to supply a 200kVA transformer, enabling a three-phase connection for new solar and ground source heat pump installations.

Mill Drowndubbs

Upgraded the electrical infrastructure at Mill Drowndubbs with new 11kV wood poles, overhead switchgear, and an additional conductor to provide a three-phase supply and transformer upgrade for an SSEN customer.

Peterhead Substation

Under an NEC3 subcontract, we built a 2000m² GIS Substation, two transformer buildings, a 210m x 150m platform, reinforced structures, improved access, and installed underground cabling with GRP covers.

Neilston Grid Stability Facility

NEC4 Option A contract involved the construction of a 653m² portal frame for a Synchronous Condenser, with 8500m² platform, 1km access road, fencing and earthing - providing robust, secure foundations for long-term operation.

Pitkevey BESS Fife, Scotland

The project covered full BoP works for a 50MW battery storage site in Fife, including access roads, drainage, switchrooms, 33kV cabling, MV transformers, BESS units, and 2km of DNO cabling over sensitive terrain.

Filter Case Studies By:

bottom of page