Case Studies

We are committed to leading the way in utilities and energy transformation contracting; our mission is to innovate and deliver sustainability. OCU’s passion for addressing complex challenges brings new standards of growth in our people and capabilities.

Filter Case Studies By:

Ernesettle Sewage Treatment Works

OCU delivered the installation of a new sludge dewatering plant at Ernesettle Sewage Treatment Works
in Devon for South West Water.

Teign Village Wastewater Site Improvements

OCU was appointed to deliver wastewater and site improvements at Teign Village to increase storm capacity and enhance treatment performance.

Aldoga Solar Farm

Our teams delivered the construction works for the 485MW Aldoga Solar Farm in Gladstone, Queensland.

Lauriston Solar Farm

Our teams delivered the civil works, underground electrical installation, surveying, pile distribution and pile installation packages for the 63MWdc Lauriston Solar Farm, located north of Ashburton in Canterbury, New Zealand.

Moura Solar Farm

The Moura Solar Farm is a 110MW renewable energy development located in Banana, Queensland. The project involved delivery of piling, mechanical and module installation works, alongside the electrical balance of plant (BoP) package across a 203-hectare site.

Lancaster Solar Farm

OCU teams delivered the piling and mechanical installation package for the 105MW Lancaster Solar Fam, located near the regional Victorian township of Lancaster.

Quorn Park Solar Farm

Our teams delivered surveying, pile distribution and pile installation works for the 98MW Quorn Park Solar Farm and associated 20MW Battery Energy Storage System (BESS).

Wambo Wind Farm

Our teams delivered underground electrical reticulation for the 506.2MW Wambo Wind Farm, located near Jandowae in Queensland’s Western Downs region.

Preseli Pumping Station

OCU delivered the upgrade of pumping and control infrastructure at Preseli Clear Water Pumping Station, which supplies treated water directly into the distribution network.

Tafarnaubach Trunk Main Renewal

OCU delivered the emergency replacement of the Tafarnaubach trunk main after a landslide during Storm Dennis caused failure of a 600mm water main supplying the local network.

Pen Y Ball Pipeline

OCU delivered the construction of a 5.2km clean water pipeline between Lixwm and Pen Y Ball Reservoir in North Wales.

Hawton 132kV Cable Diversions

OCU delivered the diversion of existing 132kV overhead line infrastructure at Hawton, Nottinghamshire, replacing eight spans of overhead line with a new underground cable system.

Ernesettle Sewage Treatment Works

OCU delivered the installation of a new sludge dewatering plant at Ernesettle Sewage Treatment Works
in Devon for South West Water.

Teign Village Wastewater Site Improvements

OCU was appointed to deliver wastewater and site improvements at Teign Village to increase storm capacity and enhance treatment performance.

Aldoga Solar Farm

Our teams delivered the construction works for the 485MW Aldoga Solar Farm in Gladstone, Queensland.

Lauriston Solar Farm

Our teams delivered the civil works, underground electrical installation, surveying, pile distribution and pile installation packages for the 63MWdc Lauriston Solar Farm, located north of Ashburton in Canterbury, New Zealand.

Moura Solar Farm

The Moura Solar Farm is a 110MW renewable energy development located in Banana, Queensland. The project involved delivery of piling, mechanical and module installation works, alongside the electrical balance of plant (BoP) package across a 203-hectare site.

Lancaster Solar Farm

OCU teams delivered the piling and mechanical installation package for the 105MW Lancaster Solar Fam, located near the regional Victorian township of Lancaster.

Quorn Park Solar Farm

Our teams delivered surveying, pile distribution and pile installation works for the 98MW Quorn Park Solar Farm and associated 20MW Battery Energy Storage System (BESS).

Wambo Wind Farm

Our teams delivered underground electrical reticulation for the 506.2MW Wambo Wind Farm, located near Jandowae in Queensland’s Western Downs region.

Preseli Pumping Station

OCU delivered the upgrade of pumping and control infrastructure at Preseli Clear Water Pumping Station, which supplies treated water directly into the distribution network.

Tafarnaubach Trunk Main Renewal

OCU delivered the emergency replacement of the Tafarnaubach trunk main after a landslide during Storm Dennis caused failure of a 600mm water main supplying the local network.

Pen Y Ball Pipeline

OCU delivered the construction of a 5.2km clean water pipeline between Lixwm and Pen Y Ball Reservoir in North Wales.

Hawton 132kV Cable Diversions

OCU delivered the diversion of existing 132kV overhead line infrastructure at Hawton, Nottinghamshire, replacing eight spans of overhead line with a new underground cable system.