top of page
6W2A1946 - Large.jpg

Case Studies

We are committed to leading the way in utilities and energy transition contracting; our mission is to innovate and deliver sustainability. OCU’s passion for addressing complex challenges brings new standards of growth in our people and capabilities.

Camblesforth Solar Farm

Camblesforth Solar Farm Ltd is developing a 68MWp solar farm with a co-located 10MW/24MWh battery energy storage system at Camblesforth Hall Farm, Selby, West Yorkshire.

Mauxhall BESS

OCU Group was appointed as Sub-EPC contractor to design, build and commission a new 25MW Battery Energy Storage System (BESS) at Mauxhall Farm, adjacent to a recently commissioned solar PV site near Immingham.

Kintore Substation - HDD Installation

OCU delivered a design-and-build HDD solution at Kintore Substation to install new cable ducts for twin 132kV circuits beneath the B977, replacing existing oil-filled cables.

Openreach Full Fibre Network Delivery

OCU is delivering a full turnkey Fibre Network Delivery (FND) programme across the south region for Openreach, enabling full fibre connectivity across multiple exchange areas.

Bredenbury Pressurised Pipeline System

OCU delivered the Bredenbury Pressurised Pipeline System for Dŵr Cymru Welsh Water as part of its Main Network Renewal programme.

School Hill & Addison Road HDD UTX

OCU delivered complex utility diversion and under-track crossing (UTX) works at School Hill and Addison Road as part of HS2’s Enabling Works Contract in Calvert, Buckinghamshire.

Power Cable Replacements

OCU supplied and installed new power cables following a fire in the west basement at Tata Steel’s Port Talbot Hot Rolling Plant, which caused significant damage to existing assets.

Grandstand Road Slip Lining

OCU delivered a distribution mains renewal programme for Dŵr Cymru Welsh Water, installing 9.3 km of new mains following investigations into existing distribution assets.

Brynmoelddu pressurised pipeline system

OCU delivered the Brynmoelddu pressurised pipeline renewal scheme for Dŵr Cymru Welsh Water, replacing an existing asbestos cement main using pipe bursting and installing 1,120 m of MDPE.

Sambar BESS Container Repairs

OCU was engaged to deliver urgent structural repairs to multiple battery containers at the Sambar Battery Energy Storage System (BESS) site following the identification of corrosion and mechanical damage during routine inspections.

Shetland Power Network Reinforcement

OCU Group is working alongside SSEN Distribution to strengthen and modernise Shetland’s power network as part of a major reinforcement programme.

Corran Narrows

OCU delivered a critical 33kV underground cable installation beneath Loch Linnhe to replace ageing seabed cables that had repeatedly faulted due to harsh tidal and geological conditions.

Filter Case Studies By:

bottom of page