Mauxhall BESS

Project Location:
North Lincolnshire
Client Name:
CSE - Canadian Solar's e-STORAGE
Project Description:
OCU Group was appointed as Sub-EPC contractor to design, build and commission a new 25MW Battery Energy Storage System (BESS) at Mauxhall Farm, adjacent to a recently commissioned solar PV site near Immingham.
The works included full civil, electrical and mechanical infrastructure to support the large-scale BESS installation. Civil works comprised site preparation, drainage, roadways, foundations, earthing and cable management systems. Electrical works included installation of balance-of-plant equipment, cabling and full testing and commissioning.
Key Stats:
25MW / 50MWh BESS
12 × Solbank 3.0 battery containers installed
3 × twin-skid PCS units
1 × single-skid PCS unit
Customer substation and auxiliary transformer installation
33kV grid connection infrastructure
16 Months
Duration
Challenge
Designing a unique fully bunded site to protect surrounding drainage systems and environment
Managing firewater containment requirements for potential emergency scenarios
Integrating a waterproof membrane and controlled drainage system across the entire site
Constructing the containment system alongside ongoing civil and electrical works
Delivering the solution without impacting the overall project programme
Solution
Close alignment with OCU’s internal project team, the client, and wider stakeholders
Designed and constructed a fully enclosed bunded perimeter system
Installed a waterproof membrane across the full site footprint
Implemented specialist aggregate backfill for controlled water flow
Installed an automated water cut-off valve integrated with site electrical systems
Coordinated design development reviews with stakeholders to maintain alignment
Delivered progressive assurance and approvals throughout construction
Outcome
Fully compliant bunded containment system successfully installed
Environmental protection measures integrated into the BESS site design
Construction delivered without disruption to the overall project programme
Infrastructure completed to support safe operation of the 25MW BESS facility
System ready to support renewable energy storage and grid flexibility