Sambar BESS Container Repairs

Project Location:
Cornwall
Client Name:
GE Sambar BESS
Project Description:
OCU was engaged to deliver urgent structural repairs to multiple battery containers at the Sambar Battery Energy Storage System (BESS) site following the identification of corrosion and mechanical damage during routine inspections.
The priority was to restore full structural integrity while maintaining operational continuity and ensuring compliance with safety and engineering standards. Working in a constrained layout around live infrastructure, OCU coordinated specialist lifting, fabrication and welding teams to complete the works safely and efficiently.
Key Stats:
Structural repairs to multiple BESS battery containers
Zero disruption to adjacent live systems
Precision lifts completed within restricted access areas
On-site steel replacement and protective recoating
3 Weeks
Duration
Challenge
Restricted access within a tightly configured BESS layout, limiting crane use and manoeuvrability
Compromised container structure, including corrosion and external damage sustained during offloading by initial contractor
Live adjacent systems requiring repairs to be planned and executed without operational interruption
Safety-critical environment with high-voltage equipment requiring strict handling protocols
Solution
Coordinated specialist lifting teams to deploy hydraulic gantry systems and compact cranes for controlled lifting and repositioning
Enabled safe access to damaged units without removing containers from site
Mobilised certified fabrication and welding specialists to undertake on-site structural assessments and steelwork repairs
Replaced damaged sections, restored structural integrity, and applied protective coatings to prevent future corrosion
Maintained close communication with site operations teams to sequence works safely around live systems
Outcome
Structural integrity fully restored across all affected BESS containers
Works delivered safely with no impact on adjacent operational systems
Access and lifting challenges resolved through bespoke engineered solutions
Protective coatings extended asset lifespan and reduced long-term maintenance requirements
Effective collaboration between OCU, site operations teams and specialist contractors ensured efficient delivery and full compliance with safety and engineering standards