top of page

Culham Science Centre, Abingdon, Oxford - SSEN

Project Location:

Oxford

Client Name:

Scottish and Southern Electricity Networks

Project Description:

OCU was appointed by SSEN to design and deliver a comprehensive electrical infrastructure upgrade at Culham Science Centre, Oxford – home to one of the UK’s leading science and research campuses.


The project supports increased energy requirements for current and future development across the site, contributing to the long-term resilience and capacity of this significant facility.

Key Stats:

  • New 132kV/11kV 15/30MVA transformer installed and commissioned. 

  • Second 15/30MVA transformer installation underway.

  • Purpose-built 11kV switch room and cabling solution

  • Fire risk assessment and mitigation.

24 Months

Duration

Challenge

  • Early-stage design assessments identified the existing site drainage as insufficient for the planned substation upgrade

  • Inadequate drainage posed a major construction risk, impacting project timelines and long-term operational performance

  • The site’s scientific and safety-critical environment demanded meticulous planning and stringent health and safety measures

  • Works had to be delivered with minimal disruption to existing operations

Solution

  • Collaborated with SSEN and stakeholders to deliver a site-specific sustainable drainage strategy

  • Designed and installed a bespoke soakaway system to manage surface water in line with environmental standards

  • Progressed electrical infrastructure upgrade through multiple coordinated phases, maintaining safety and resilience

Outcome

  • First phase successfully delivered, replacing and commissioning the initial 132kV transformer

  • Electrical capacity across the site significantly increased

  • Ongoing works include substation extension and final transformer installation to support future energy demands

  • Ensured long-term value for the client and energy security for critical infrastructure

bottom of page