We are committed to leading the way in utilities and energy transformation contracting; our mission is to innovate and deliver sustainability. OCU’s passion for addressing complex challenges brings new standards of growth in our people and capabilities.

Filter Case Studies By:

Grandstand Road Slip Lining

OCU delivered a distribution mains renewal programme for Dŵr Cymru Welsh Water, installing 9.3 km of new mains following investigations into existing distribution assets.

Brynmoelddu pressurised pipeline system

OCU delivered the Brynmoelddu pressurised pipeline renewal scheme for Dŵr Cymru Welsh Water, replacing an existing asbestos cement main using pipe bursting and installing 1,120 m of MDPE.

Sambar BESS Container Repairs

OCU was engaged to deliver urgent structural repairs to multiple battery containers at the Sambar Battery Energy Storage System (BESS) site following the identification of corrosion and mechanical damage during routine inspections.

Shetland Power Network Reinforcement

OCU Group is working alongside SSEN Distribution to strengthen and modernise Shetland’s power network as part of a major reinforcement programme.

Corran Narrows

OCU delivered a critical 33kV underground cable installation beneath Loch Linnhe to replace ageing seabed cables that had repeatedly faulted due to harsh tidal and geological conditions.

Street works UK material classification

In response to the 2025 introduction of the Street Works UK Material Classification Protocol, OCU faced the challenge of rapidly embedding a new set of environmentally-critical workflows across its street works operations.

Axford Pipeline Thames Water

OCU was appointed to deliver the Axford Pipeline scheme for Thames Water. The project involved constructing a 17.6km clean water pipeline, building a new booster station at Dorcan.

Falmouth Docks
Zero Emission Vessel Infrastructure

The Falmouth Docks Infrastructure Upgrade was a strategically important, government-funded
project aimed at enabling zeroemission operations within a site of outstanding natural beauty.

Orkney-Caithness HVAC 220kV Landfall

OCU Group delivered two 1,200m parallel landfall crossings as part of SSEN’s 220MW high-voltage transmission project linking Finstown in Orkney to Dounreay in Caithness.

Culham Science Centre, Abingdon, Oxford - SSEN

SSEN appointed OCU to design and deliver a major electrical infrastructure upgrade at Culham Science Centre, Oxford. The project enhances capacity and resilience to meet growing energy demands and support future development across this leading UK research campus.

Vyrnwy Aqueduct Modernisation Programme

The Vyrnwy Aqueduct programme involves a major refurbishment of one of United Utilities' oldest and most strategic clean water assets. Phase one, completed in 2024, included cleaning, seal repairs, and new valves on Line 3. The project is scheduled to be finished by 2028.

Customer Focused Framework Yorkshire Water

Yorkshire Water appointed OCU to deliver key works under its Clean and Waste Infrastructure and Customer Focused Infrastructure Frameworks, part of the £650m AMP7 investment programme (2020-2025). Following a strong performance, OCU secured a four-year extension into AMP8.

Grandstand Road Slip Lining

OCU delivered a distribution mains renewal programme for Dŵr Cymru Welsh Water, installing 9.3 km of new mains following investigations into existing distribution assets.

Brynmoelddu pressurised pipeline system

OCU delivered the Brynmoelddu pressurised pipeline renewal scheme for Dŵr Cymru Welsh Water, replacing an existing asbestos cement main using pipe bursting and installing 1,120 m of MDPE.

Sambar BESS Container Repairs

OCU was engaged to deliver urgent structural repairs to multiple battery containers at the Sambar Battery Energy Storage System (BESS) site following the identification of corrosion and mechanical damage during routine inspections.

Shetland Power Network Reinforcement

OCU Group is working alongside SSEN Distribution to strengthen and modernise Shetland’s power network as part of a major reinforcement programme.

Corran Narrows

OCU delivered a critical 33kV underground cable installation beneath Loch Linnhe to replace ageing seabed cables that had repeatedly faulted due to harsh tidal and geological conditions.

Street works UK material classification

In response to the 2025 introduction of the Street Works UK Material Classification Protocol, OCU faced the challenge of rapidly embedding a new set of environmentally-critical workflows across its street works operations.

Axford Pipeline Thames Water

OCU was appointed to deliver the Axford Pipeline scheme for Thames Water. The project involved constructing a 17.6km clean water pipeline, building a new booster station at Dorcan.

Falmouth Docks
Zero Emission Vessel Infrastructure

The Falmouth Docks Infrastructure Upgrade was a strategically important, government-funded
project aimed at enabling zeroemission operations within a site of outstanding natural beauty.

Orkney-Caithness HVAC 220kV Landfall

OCU Group delivered two 1,200m parallel landfall crossings as part of SSEN’s 220MW high-voltage transmission project linking Finstown in Orkney to Dounreay in Caithness.

Culham Science Centre, Abingdon, Oxford - SSEN

SSEN appointed OCU to design and deliver a major electrical infrastructure upgrade at Culham Science Centre, Oxford. The project enhances capacity and resilience to meet growing energy demands and support future development across this leading UK research campus.

Vyrnwy Aqueduct Modernisation Programme

The Vyrnwy Aqueduct programme involves a major refurbishment of one of United Utilities' oldest and most strategic clean water assets. Phase one, completed in 2024, included cleaning, seal repairs, and new valves on Line 3. The project is scheduled to be finished by 2028.

Customer Focused Framework Yorkshire Water

Yorkshire Water appointed OCU to deliver key works under its Clean and Waste Infrastructure and Customer Focused Infrastructure Frameworks, part of the £650m AMP7 investment programme (2020-2025). Following a strong performance, OCU secured a four-year extension into AMP8.