Water & Environmental

Our proven expertise in both framework delivery and bespoke project solutions is supported by

an extensive national network of offices and depots, ensuring a reliable, responsive service.

OCU is a water & environmental infrastructure service provider, safely delivering innovative and reliable solutions. We offer consultation, design, build and maintenance support for our clients across the UK & Ireland. 


From potable and raw water systems to sewer risings mains, sewer replacement, refurbishment and more, we work closely with treatment facilities, water and wastewater networks. In addition we offer comprehensive specialist design and installation capability across the Heat Networks sector.




sample-ocu-illustration.png
  1. Wastewater Sewer Works

  2. Wastewater Modular Treatment Plants

  3. Water Infrastructure

  4. MEI

Our range of Water & Environmental services includes:

Design consulting and process engineering

  • Advanced water designs

  • Specialists in MEICA and process design/engineering

  • Consulting services

  • Design and engineering

  • Temporary works design

  • Digital engineering

  • Building Information Modelling (BIM)

Non-infrastructure – treatment system solutions

  • New builds, refurbishment, and upgrades

  • New build reservoirs and Pumping stations

  • Tanks, including raw water storage, primary contact, filtration, settlement

  • Storage tanks and mixers

  • Dual contained pipework and chemical dosing systems

  • Aeration, primary, secondary and tertiary treatment plants

  • SAF, iSAF & Anoxic SAF Biological wastewater treatment

  • Electrical installations, instrumentation control and automation

  • Modular hire solutions

Treatment technology process solutions – modular

  • Design, development, manufacturing, selection of temporary and permanent wastewater treatment systems.

  • Full civil, mechanical and electrical installation

  • Maintenance of existing assets

  • Product supply for primary and secondary solids removal, phosphorus removal and biological treatment

Mechanical, electrical and instrumentation solutions

  • Project management and design (HV & LV)

  • Commissioning and protection testing

  • Full commissioning of HV installations

  • NICEIC approved contractor for hazardous and non-hazardous areas

  • Electrical design to BS7671

  • Cable installation – power, controls, and communications

  • Inspection and testing capabilities

  • Design and manufacture of LV control panels

Infrastructure – pipelines, developer and network services

  • Civils work

  • Traffic management and streetworks

  • Pipelines

  • Mains Renovation

  • Slip lining

  • Service replacements

  • Developer Services (WIRS)

  • Large scale new connections and commercial supply

Flood defence, harbour and pier, surface water management Flood Defence

  • Construction of flood defence

  • Earthworks embankment

  • Pumping station installation

  • Flood gate installation

  • Dredging and dredge deepening

  • Foreshore reclamation

  • Seawall construction

  • Surface water management ponds and channels

  • SUDs and Swales construction

What our clients say...

Featured Case Studies

HS2 Infrastructure
Enabling and Multi Utility Diversion Works

Delivering utility diversions across water, gas, power and telecoms for a major UK rail project, with our Water and HDD teams applying NIRS, GIRS and WIRS accreditations to complete complex works in constrained environments.

Capital Major / Minor Mechanical and Electrical Frameworks

Delivering clean and wastewater projects as a Capital Alliance Delivery Partner for Welsh Water under AMPs 8 & 9, building on over 15 years of partnership and framework support across pipelines, mechanical and electrical works.

Cork Harbour Horizontal Directional Drilling

OCU was contracted to design and install twin 1,025 metre lengths of 500mm Diameter SDR-9 PE100 Foul Main under Cork Harbour using Horizontal Directional Drilling (HDD).

Dee-crossing Connah's Key

OCU was awarded the Dee Crossing contract, located in Connah’s Quay. Our teams designed and installed two 860m-long barrier pipelines under the River Dee using Horizontal Directional Drilling (HDD). 